The baseline environmental
monitoring was conducted according to the EM&A Manual for air quality and
noise.
According
to EM&A Manual Section 2.1.5 and Section 3.1.3, the monitoring locations of
air quality monitoring and noise monitoring are defined. However, due to site
constrains AM2, is relocated to alternative locations as shown in Table 3.3. Also,
monitoring at NM1 and NM2 could not be conducted due to objections from the
property owners.
The monitoring methodology and
parameters monitored are all in line with the EM&A Manual.